Follow us

Full bathroom renovation

Full Bathroom Renovation

Option 4: Full Bathroom Renovation or New Bathroom Waterproofing - Standard 25 Year Waterproofing Warranty

The Ultimate Bathroom Upgrade

When you choose a full bathroom renovation to repair a leak or your simply waterproofing your new bathroom then the Tank’d Waterproofing System is for you, you’re not just getting a fresh new look—you’re getting total lifetime protection. Our 25-year liner is applied across the entire bathroom, so it’s not just your shower that’s safeguarded—it’s every corner of the space.

With the most advanced waterproofing technology available today, you can rest assured that the thousands you invest in your bathroom’s design and fit-out will remain protected for the next quarter-century. No leaks. No failures. No costly repairs.

We can also pair your design with our Clear Waterproofing Membrane, which makes it possible to use building materials that were previously unsuitable for wet areas—such as wallpaper, exposed brick, painted murals, and much more. This means your creativity is no longer limited by tiles you can have something that is truely uniquie.

And if you ever decide to sell, the Tank’d Waterproofing System becomes a powerful selling point—giving new owners the confidence that your bathroom will remain free from water issues for decades to come.

Tank’d isn’t just a renovation—it’s a lifetime upgrade. Check out some of the bathrooms we have created….

Check out the images of how the process works.

Step 1:

Remove existing bathroom including wall sheeting or for a new bathroom start before the wall sheeting has been installed but after the floor sheeting has been installed

bathroom

Step 2:

Install Tank’d Loose Laid Liner in the correct direction so that there are no seams

Tank'd Loose

Step 3:

Install the wall sheeting

Clear Waterproofing

Step 4:

Screed the floors

Waterproofing

Step 5:

Waterproof first coat – Tank’d L.A.P Grey on top of screed and wall sheeting.

Step 6:

Waterproof second coat – Tank’d L.A.P Purple on top of screed and wall sheeting.

Waterproofing

Step 7:

Lay Tiles

Lay Tiles

Step 8:

Paint walls that arent getting tiled with Clear Waterproofing Membrane, install shower screen, window and bathroom furniture. Design Bathroom Complete with Tank’d L.L.L 25 year waterproofing System installed 

Lay Tiles